
Kitchen renovations
Kitchen Renovationsin Vancouver
A kitchen that works against you does it three times a day. The fix starts with where things sit and what runs behind them, not with the doors.
- Over 20 years
- Working in Vancouver and the Lower Mainland
- Licensed and insured
- British Columbia
- Design, permits, build
- One company from the drawings to handover
Most of the decisions are behind the doors
A kitchen is a services problem wearing a finish. Where the sink, the hob and the fridge sit decides where the waste falls, where the circuits run and how much ceiling has to come down. Those positions are the expensive thing to change later and the cheapest thing to change on a drawing.
So the layout is resolved first, against the room you actually have: the window heads, the floor you are keeping, the wall the extractor can reach. You see plans, elevations and real samples before anything is ordered, and the cabinetry is drawn for your walls rather than assembled out of stock widths.
How far does it go?
- The kitchen on its ownThe room is stripped and rebuilt while the rest of the house keeps working. Most families stay living there.
- The kitchen and the floor around itWalls between the kitchen, dining and living come out together. That is structure, and it belongs in a wider renovation.

What a kitchen project touches
A kitchen is the densest room in the house. Water, waste, gas, power, ventilation and daylight all land in the same few square metres, and they are planned together or not at all.
- Where things sitSink, hob, fridge and prep space arranged around how you cook, then tested against where the services can actually go.
- Plumbing and powerSupply, waste, gas and circuits reset to the new layout and brought to current code while the walls are open.
- Cabinetry and storageDrawn for your walls and your ceiling height, with the awkward corner resolved rather than filled with a carousel.
- Light to work byTask light on the counter and a softer layer for the room, planned with the circuits instead of added at the end.
- Extraction and appliancesDucting routed to an outside wall, and appliance sizes fixed before the cabinets are drawn around them.
- Daylight and the view outWindow heads, sightlines and where you stand, so the room is bright at the times you are in it.

The order a kitchen goes back together

Nothing is ordered until the layout is signed off, because a cabinet run is manufactured to a drawing and a drawing is what changes cheaply.
Stage 01
Measure and assess
The room is surveyed and the services are traced.
We measure the room, find the waste run and the incoming services, and check what the walls and the floor are made of. You come out of it with a scope and a budget you can decide on.
Stage 02
Layout, then specification
The plan is settled before a single finish is chosen.
Positions first: sink, hob, fridge, tall units, the extractor route. Then elevations, cabinet construction, worktop and appliances, with real samples to handle. Permits are prepared from the same set.
Stage 03
Strip out and first fix
The old kitchen comes out and the services are reset.
Demolition, any structural work, then plumbing, electrics and ventilation run to the new positions and inspected before anything is closed up. This is the part nobody photographs and the part that decides the rest.
Stage 04
Fit, finish and handover
Cabinets, stone, appliances, then a walk-through.
Cabinetry is installed and levelled, the worktop is templated and fitted, appliances are connected and tested. We walk the room with you and close out the list from that walk.
The projects these kitchens came from
Two Vancouver homes CAS renovated throughout, with the kitchen at the centre of each. Photographed after the owners had moved back in.

In the owner’s words
“We’re really happy with the transformation. CAS updated every part of the home and the difference is huge. The finishes are clean and the quality is solid across the board. A smooth process from start to finish.”
What moves a kitchen quote
Two kitchens with the same footprint are rarely the same job. These are the four things that separate them.
- The specification
- Cabinet construction, worktop material and appliances. One layout can be specified several ways over, and this is where most of the range sits.
- Moving water and waste
- A sink or dishwasher that crosses the room needs new falls to the drain. Over a concrete floor or in a condo, that is structural work.
- What is behind the old kitchen
- Brittle wiring, tired drains and walls that are nowhere near square are normal in an older house. We open up and check before the budget is fixed.
- Taking a wall out
- Joining the kitchen to the next room brings an engineer into the drawings and a beam into the ceiling, and lengthens the permit.
You get a line-itemed budget before the strip-out: cabinetry, stone, appliances, services and labour priced separately, so changing one of them is a visible decision rather than an absorbed one.
Questions about kitchen renovations
It depends on whether the layout moves, whether anything structural is involved, and the lead time on the cabinetry and the worktop. You get a dated schedule during planning, before anything is ordered, and it is updated weekly once the work starts.
Usually yes, but not with a working kitchen. We tell you during planning roughly how long you will be without one so you can set something up elsewhere, rather than finding out after the strip-out.
Yes. Our design team takes you through layout, cabinetry, worktops, tile and appliances, and you see real samples rather than a swatch on a screen. We narrow the field and explain the trade-offs; the choices are yours.
If you move plumbing, electrical circuits or a load-bearing wall, yes. Purely cosmetic changes sometimes do not need one, but as soon as the systems are altered, city approval is required. We handle the permitting for you.
There can be. If the work includes replacing your water heater with a qualifying high-efficiency heat pump water heater, you may be eligible through BC Hydro’s Home Renovation Rebate Program. Eligibility is set by the programme, so we check it against your scope rather than promising it.
It depends on the specification, on how much moves behind the walls and on what the opened-up room shows. You get a line-itemed proposal before work begins, and any change to scope or cost is priced and agreed with you before that work happens.
Something not answered here?
Vancouver office, by appointment only.
Before you commit to anything
What the work involves, what sets the number, and what the city asks for, written out in full rather than summarised.
All guides
Quartz vs Granite vs Porcelain Countertops in Vancouver: Price, Durability and MaintenanceThree materials that arrive in the same shape and behave nothing alike. One is quarried rock, one is mineral bound in resin, one is fired clay, and heat, oil and a dropped pan tell them apart. No slab price here: it moves with the stone, the edge and the fabricator.
Kitchen Renovation Costs in Vancouver in 2025: Real Prices by Scope and FinishA kitchen quote is five unlike things added together, and they do not grow for the same reasons. Knowing which line each of your decisions lands on is worth more than a rate per foot you have no way to check.
Condo Kitchen Renovations in Vancouver: Strata Rules, Permits and TimelinesA condo kitchen is a small room inside somebody else’s building. Three parties have a say in it, and the one that answers first is the strata — not the City, and not you.
Tell us what the kitchen has to do
How you cook, how many of you there are, what is in the way now. We will come back with what the room can be and what it takes to get there.
Steven Kwok, CAS Developments(778) 909-8321
Prefer to send a note? Contact page




