
Custom homes
A Custom Homein Vancouver
A new house is the one chance to stop working around somebody else’s plan. What you can build is set by the lot, long before it is set by the brief.
- Over 20 years
- Working in Vancouver and the Lower Mainland
- Licensed and insured
- British Columbia
- Design, permits, build
- One company from the drawings to handover
The lot briefs the house
Every custom home starts as a set of constraints: what the zoning allows on that lot, where the services run, how the ground behaves, and which way the light arrives. The house is designed into that, and the earlier it is understood, the less of the design gets paid for twice.
From there it runs as one sequence — survey, concept, engineering, permit, build — carried by the same team from the first sketch to the final inspection. The drawings that get approved are the drawings that get built.
Where are you starting from?
- A lot, or a house coming downA new house designed into what the lot allows, from the survey through to the occupancy permit.
- A house worth keepingWhere the structure is sound and the location is right, a whole-house renovation reaches most of the same rooms with far less demolition.

What a new house has to resolve
A renovation inherits most of its answers from the building already standing there. A new house has to produce every one of them.
- The lotSurvey, orientation, slope, trees and where the services come in, established before the first plan is drawn.
- What may be builtFloor area, height and setbacks confirmed against the zoning on your property, so the design starts inside the envelope it is allowed.
- Plan and section togetherWhere you gather, sleep and move between the two, drawn in section as well as plan so ceiling heights are designed rather than left over.
- Structure and engineeringFoundations for the ground you actually have, and a frame drawn with the spans the rooms need rather than the rooms the spans allow.
- The envelopeInsulation, airtightness and glazing, which between them decide what the house costs to run for as long as you own it.
- DaylightOpenings placed for the hours you use each room, on a site where the good light is often on one side only.
- Millwork and built-insStorage, joinery and the fitted pieces drawn with the rooms, not specified after the walls are up.
- Where the house meets the groundTerraces, levels and the way the ground floor reaches the garden, designed with the house instead of landscaped around it afterwards.

A new house, stage by stage

- Design, planning and permits
- 2 to 4 months
Five stages, and the first two are where the money is made or lost. Everything after the permit is execution.
Stage 01
Brief and feasibility
What you want, against what the lot permits.
We walk the site, review the survey and the zoning, and set the brief against both. You end this stage knowing the size and shape of house the lot will carry, and a budget range to decide on.
Stage 02
Concept and design
Options first, then one resolved house.
Concepts are tested in plan and section, then developed into one design with elevations, materials and real samples. You see it as a building, not a mood board.
Stage 03
Engineering and permits
Consultants, drawings, submission.
Structural and any specialist engineering are drawn into the same set, and the permit application goes in complete. We handle the city’s requests for further information.
Stage 04
Construction
Groundwork to the final coat.
Excavation, foundations, frame, envelope, services and finishing run under one project manager, with a weekly update and the inspections booked and attended for you.
Stage 05
Completion and handover
Tested, corrected, then handed over.
Every system is commissioned and tested, the snag list is worked through, and we walk the whole house with you before handover and close out what comes off that walk.
In the owner’s words
“CAS treated our project like it was their own home. We always felt heard and knew exactly what was happening. The quality is unbelievable!! Friends and family can’t stop complimenting the work.”
What separates two houses of the same size
The brief sets the rooms. These six set the number underneath them.

- The ground
- Rock, fill, a high water table or a steep slope change the foundation before they change anything above it, and they are found by investigation rather than assumption.
- Size
- Floor area drives nearly every trade at once — roof, cladding, flooring, heating runs, plumbing stacks — which is why it is agreed before the design develops.
- Specification
- The same house can be built to a restrained specification or a demanding one. Joinery, stone, glazing and systems are where the range opens up.
- Getting services to the house
- Water, sewer, power and gas connections are a cost and a programme item in their own right. They are itemised rather than buried in a square-foot rate.
- Changes after the permit
- A change made before submission is a drawing change. The same change afterwards is a resubmission, and it costs time before it costs anything else.
- The house in ten years
- A parent moving in, an adult child moving back, a room that has to become an office. Designing for it now is far cheaper than adding it later.
You get a line-itemed budget before construction starts: groundwork, structure, envelope, services, finishes and consultants priced separately. A contingency is planned in from the beginning rather than introduced when something is found.
Questions about custom homes
Yes. The permit application, the engineering submissions, the city’s requests for further information and the service connection approvals a new house needs are all handled for you. You are not the one chasing them.
As much or as little as you want. There are decisions only you can make — layout, materials, where the money goes — and we bring those to you in a sensible order. The coordination between trades is ours.
A renovation works within a structure that already exists and inherits its constraints. A custom build sets every dimension from the start, and in exchange it has to resolve the lot, the servicing and the engineering from nothing.
Yes. We are happy to build from an architect’s set. We review it for constructability and cost before pricing it, which is the point where changes are still cheap.
Something not answered here?
Vancouver office, by appointment only.
Start with the lot
Send us the address and what you want to build. We will come back with what the zoning allows and what the ground is likely to ask for.
Steven Kwok, CAS Developments(778) 909-8321
Prefer to send a note? Contact page

