What CAS does
Renovations, additions and custom builds
Design, engineering, permits and construction on every project, from a single room to a build from the lot — 8 services, each with its own page.
- Over 20 years
- Across Vancouver and the Lower Mainland
- Licensed and insured
- British Columbia
- Design, permits, build
- One company from the drawings to handover
Not sure which option is right for you?
Three ways a project usually starts. Each one opens the service page that covers it in full.
- RenovateRework the house you already own, one room or every room.
- Add onGrow up, out or back with an addition or a laneway house.
- Build newStart from the lot with a custom home designed around you.

Full Home Renovations
Breathe new life into your entire space with a cohesive, custom full home renovation in Vancouver.
Explore full home renovationsNot sure which one you need?
Describe the house and what is not working. We will tell you which of these it is, and what the structure allows, before anyone talks about finishes.
Book free consultationWho you would be talking to
Steven Kwok, CAS Developments(778) 909-8321

