Skip to content
Row of character houses with gabled roofs, deep porches and clipped hedges under an overcast sky

Heritage and character homes

Heritage andCharacter Homes

A Vancouver pre-war house is worth more than its floor plan. The questions are what may be altered, what has to be kept, and which permit decides it.

Over 20 years
Working in Vancouver and the Lower Mainland
Licensed and insured
British Columbia
Design, permits, build
One company from the drawings to handover

Built differently, so renovated differently

Vancouver’s pre-war houses were put up with old-growth fir, hand-run millwork, masonry fireplaces and joinery that is not available now. The craftsman bungalows of Kitsilano, Mount Pleasant and Riley Park, the Edwardian and Tudor houses of Strathcona, Shaughnessy, Kerrisdale and Point Grey, the post-war houses of Dunbar and South Granville: each carries its own structure and its own set of rules.

Two of those rules are easy to confuse. A property on the Vancouver Heritage Register can require a Heritage Alteration Permit before a building permit is issued. A property in a character retention zone has guidelines for the outside of the house. They are separate questions. We check both before any design work starts.

Bay-windowed living room with an exposed brick chimney breast, white walls and a dark timber floor

What heritage work has to account for

A character home renovation carries everything a normal renovation does, and then a second layer of constraints that decides the order the first layer happens in.

  • The permit pathwayA Heritage Alteration Permit where the property is on the Register, and the building, electrical, plumbing and mechanical permits either way.
  • Character-defining elementsCladding, windows, rooflines, porches and significant interior features: what a heritage review looks at, and what is worth keeping regardless.
  • Pre-war structureSeveral load-bearing walls and a structural logic that is not modern framing. Opening up a main floor is an engineering question first.
  • What is behind the lathKnob-and-tube wiring, galvanised plumbing at the end of its life, undersized members, and occasionally vermiculite insulation that needs specialist handling.
  • Comfort in an old houseInsulation, draughts and single glazing improved from the inside, where the outside of the house is governed by guidelines.
  • Matching what is thereNew joinery run to the profiles already in the house, so a repaired or extended room does not announce itself.
  • Rooms that work nowKitchens, bathrooms and daily storage brought up to date, placed so the rooms that give the house its proportions keep them.

How a heritage project runs

Terrace of Victorian houses with bay windows, iron balconies and a corner turret
Design, planning and permits
2 to 4 months

The difference is at the front. What the property is, and what that permits, is settled before a design exists — because on a designated house the design answers the review.

  1. Stage 01

    Status and condition

    What the house is, legally and structurally.

    We check whether the property is on the Vancouver Heritage Register and at what category, whether character retention guidelines apply, and what condition the structure, wiring and plumbing are in.

  2. Stage 02

    Design inside the constraints

    Modern rooms, character kept.

    The layout is developed against what may and may not change. Where load-bearing walls come out, the support is engineered and drawn into the same set as the architecture.

  3. Stage 03

    Permits, including the HAP

    A heritage application, then the standard ones.

    Where a Heritage Alteration Permit is required, we prepare and submit it and work with the city’s heritage planning staff through the review. The building, electrical, plumbing and mechanical permits are filed alongside.

  4. Stage 04

    Build, protecting what stays

    Careful demolition, modern systems.

    Original floors, trim and glazing that are being kept are protected or carefully removed and reinstated. Wiring, plumbing and insulation are replaced while the walls are open, which in a pre-war house usually means all of them.

  5. Stage 05

    Reinstatement and handover

    Put back, matched, then walked.

    Retained elements go back, new joinery is matched to the old profiles, and we walk the house with you before handover and close out the list that comes off it.

Why heritage work runs differently

Not more complicated for its own sake. Each of these has a specific cause, and all of them are visible before the work starts.

Restored character house in deep red with cream trim, a deep porch and a bay window, seen from its lawn

Designation and zoning status
Whether the house is on the Register, at what category, and whether it falls in a character retention area. These set what may change before anything else does.

Systems at the end of their life
In a pre-war house, wiring and plumbing are usually replaced rather than extended. That is a bigger job than an upgrade and it is priced as one.

Working around what stays
Original floors, trim and glazing have to be protected, lifted carefully or matched. That is time on site, and it is the time that protects the thing you are paying for.

Review takes longer
Heritage review and the structural assessment of original framing both add time at the front, which is why permitting starts while the design is still moving.

What opening up reveals
Pre-war houses hold surprises behind the plaster. A contingency is planned into a heritage budget from the start, because here that is normal rather than unusual.

Heritage work generally costs more than the same rooms in a newer house. Systems get replaced instead of extended, original material takes longer to work around, and the review adds time. The proposal shows which of those is driving which line.

Questions about heritage renovations

  • It is a permit the City of Vancouver requires before a building permit is issued for properties on the Vancouver Heritage Register at Category A, B or C. The review looks at proposed changes to the character-defining elements of the property. Not every pre-war house needs one — it depends on whether your property is on the Register and at what category. We check that at the start of every project, before any design fees are committed.

  • In most cases yes, with the right structural engineering. Pre-war houses were built with several load-bearing walls, and their structural logic is not modern framing. We assess the structure before any wall removal is proposed, engineer the support and include that work in the permit drawings.

  • Yes. We manage Heritage Alteration Permit applications where they are required, along with the City of Vancouver building, electrical, plumbing and mechanical permits, from application through to final inspection. You do not need to coordinate with a city office yourself.

  • Knob-and-tube wiring that has to be fully replaced. Galvanised plumbing at the end of its life. Structural members undersized by current standards, and occasionally materials such as vermiculite insulation that need specialist handling. The planning stage is designed to surface as many of these as possible before work begins.

  • Heritage and character homes across Vancouver — Kitsilano, Dunbar, Point Grey, Kerrisdale, Shaughnessy, Mount Pleasant, Strathcona, Riley Park and South Granville — and the North Shore.

Something not answered here?

Vancouver office, by appointment only.

Find out what applies to your house

Send us the address. We will come back with whether it is on the Register, what the zoning asks of it, and what that means for what you want to do.

Steven Kwok, CAS Developments(778) 909-8321

Step 1 of 4 · Project

Every field is required unless its label says optional.

What are you planning?
We only use your details to reply about your project.

Prefer to send a note? Contact page

CallBook consultation