
Home additions
Home Additionsin Vancouver
Moving buys you a whole house to get three rooms. An addition puts those rooms where you already live — if the structure, the lot and the zoning agree.
- Over 20 years
- Working in Vancouver and the Lower Mainland
- Licensed and insured
- British Columbia
- Design, permits, build
- One company from the drawings to handover
Up, out, or into what is already there
A house grows in a small number of directions, and which one suits yours is not a matter of taste. It is decided by the foundations under it, the structure of the roof over it, what the lot allows, and how the new rooms reach the old ones.
So the first drawings are not of the addition. They are of the house you already have: what carries load, where the services run, where the floor levels sit and where the join will be. The addition is designed into that, which is why it ends up looking like it was always there.
More rooms, or more house?
- Work inside the footprint you haveRearranging walls, opening up a floor and using the basement or the roof can find most of the space without new foundations.
- Add floor areaA second storey, a rear or side extension, or a new room between the house and the garden.

Where the extra space comes from
Every one of these has a different structural consequence and a different effect on how you live while it happens, which is why they are compared before one is chosen.
- Up: a second storeyNew bedrooms or a primary suite over the existing footprint, without giving up the garden. What is underneath has to be checked first.
- Out: a rear or side extensionExtending the main floor so the kitchen, dining and living run together and actually reach the garden.
- In: the roof or the garageSpace that is already inside the envelope, which usually means no new foundations and a very different budget.
- Between: a sunroom or covered roomA room that works in Vancouver rain, with levels and thresholds set so it reads as part of the house and not a lean-to.
- The joinWhere new structure meets old: floor levels, the roof line, and the wall that has just become an internal one. Additions are won and lost here.
- What the services have to carryHeating, hot water and the electrical panel sized for the house you will have rather than the one you have now.

From survey to the finished join

- Design, planning and permits
- 2 to 4 months
An addition is two projects that have to meet: a new building, and the alterations that let the old one accept it.
Stage 01
Survey the house and the lot
What is there, and what may be built beside it.
We measure the house, establish what the structure can carry, and check the zoning on your lot — floor area, setbacks, height — before a design commits to anything.
Stage 02
Design and engineering
One set of drawings covering both halves.
The addition, the alterations and the join are drawn together, with the structural engineering alongside them. You see the outside and the inside of the connection, drawn as a building rather than a plan with a box added.
Stage 03
Permits
Submitted complete, and chased.
We prepare and submit the application, answer the city’s requests for further information, and keep the design moving while review runs so the two do not queue behind each other.
Stage 04
Build, join and finish
Weatherproof first, then open the house up.
Foundations, structure and envelope go up first, so the new part is closed in before the existing wall or roof is opened. Then services, finishes and the walk-through with you.
In the owner’s words
“We didn’t have time to micromanage anything. CAS got that! Steven ran the show, kept it clean, and gave us beyond what we were hoping for. Professional without being uptight! Highly recommend!”
What decides what you can add
Five answers that arrive before a design does, and that between them set both what is possible and what it costs.

- What the lot allows
- Floor area, setbacks and height come from the zoning on your property. We confirm them first, so the design starts inside what is permitted.
- What is under the house
- A second storey is carried by the foundations and the walls below it. Whether they can take it is an engineering answer, and it comes early.
- Matching what is there
- Cladding, windows and rooflines that meet the existing house convincingly are a drawing problem before they are a materials problem.
- Getting to the back of the lot
- What can physically reach the rear — an excavator, a crane, a concrete truck — changes the method and the cost of the identical addition.
- Living through it
- Some additions are built while you stay. One that opens the roof or the back wall usually is not. You are told which during planning.
The budget separates the new building from the alterations to the existing house, because the two move independently. The join is where surprises live, so it is priced as its own line.
Questions about home additions
That is a design decision we make with you, and either answer can be right: matching the existing architecture, or drawing a deliberate line between old and new. What matters is that the junction, the cladding and the roofline are resolved on the drawings rather than on site.
Yes. Additions need permits because they have to meet the building code and the zoning that applies to your lot. We prepare and submit the application, deal with the city’s questions and attend the inspections.
Often yes, particularly where the new structure can be built and closed in before the existing wall is opened. A second storey that takes the roof off is the harder case. We tell you which one you are in during planning.
Second-storey additions, rear and side extensions, sunrooms and covered outdoor rooms, and garage or attic conversions. We also take on one-off projects that do not fit any of those descriptions.
Yes, and on an addition that matters more than usual. The team that draws it engineers it, applies for the permit and then builds it. Nobody takes the project over at the point where new structure meets old.
Something not answered here?
Vancouver office, by appointment only.
Before you commit to anything
What the work involves, what sets the number, and what the city asks for, written out in full rather than summarised.
All guides
Garage and Attic Conversions in Vancouver: Adding Living Space Without MovingA garage and an attic are already enclosed, which is the part that makes a conversion look simple. Everything after that is the gap between enclosed space and space you are allowed to live in.
House Additions in Vancouver: Costs, Permits, and Design TipsThe zoning on your lot says where a building may stand. An engineer says what the foundations already under the roof can carry. Between them they decide whether your house can grow, and in which direction, and both can be established early.
Find out which direction your house grows in
Tell us what you are short of and send a photo of the back of the house. We will come back with what the lot and the structure allow.
Steven Kwok, CAS Developments(778) 909-8321
Prefer to send a note? Contact page

