Skip to content
Freestanding bath under a window beside a timber open-shelf vanity, with concrete-finish walls and large grey floor tiles

Bathroom renovations

BathroomRenovationsin Vancouver

The smallest room in the house and the one most likely to be built twice. What goes in behind the tile decides which of those it turns out to be.

Over 20 years
Working in Vancouver and the Lower Mainland
Licensed and insured
British Columbia
Design, permits, build
One company from the drawings to handover

The layer you never see again

A bathroom is a waterproofing job with a finish on top. The membrane, the falls to the drain, the fixings and the extractor run are what decide whether the room stays sound. Every one of them is invisible the day it is finished.

Which is why the order matters more than the selection. Layout and services are settled on paper, the room is built back in sequence, and the tile goes on last — over work that has already been checked.

Which bathroom are we talking about?

Long bathroom with a freestanding bath under a window, a concrete-finish wall and a wall-hung basin

What a bathroom project involves

Small room, long list. Most of it is decided before the first tile is cut, and nearly half of it is never seen again.

  • Layout and movementWhere the door swings, where you stand to dry off, and whether the room can borrow space from a cupboard or a landing.
  • WaterproofingMembrane, falls and junctions detailed to the drain. This is the layer that fails first when it is rushed.
  • Plumbing and electricsSupply and waste reset to the new positions, with circuits, the extractor and any heated floor run before anything is closed up.
  • VentilationAn extractor sized for the room and ducted outside, which is what keeps the paint, the grout and the ceiling where they are.
  • Light at the mirrorLight you can actually shave or put on make-up in, with a softer layer for the rest of the room.
  • Warmth underfootHeated floors, insulation where the room sits on an outside wall, and a towel rail on a circuit that suits it.
  • Vanity and storageDrawn around the basin and the trap rather than bought to fit, with drawers that clear the plumbing.
Bathroom seen through an open door, with a double vanity, two oval mirrors and a freestanding bath in the window bay beyond

How a bathroom gets rebuilt

Grey trough basin on a white vanity below a window with a venetian blind

The room is stripped to the structure, made watertight, and then finished. Each of those has to be signed off before the next one starts.

  1. Stage 01

    Survey and scope

    What is there, and what is under it.

    We measure the room, find the stack and the waste run, and check the floor and the substrate. If something looks like it has been leaking, we say so then rather than later.

  2. Stage 02

    Layout and specification

    Positions first, then tile, stone and brassware.

    The plan is set around the fixed points we cannot move cheaply. Then the finishes are chosen against it: tile format, stone, glass and brassware, with the setting-out drawn rather than decided on site.

  3. Stage 03

    Strip out, first fix, waterproof

    The hidden half of the job.

    Out to the joists and the studs, services run and tested, substrate corrected, falls formed and the membrane applied and checked. Nothing is tiled over work that has not been looked at.

  4. Stage 04

    Tiling, fitting and handover

    Finishes, then the room gets used.

    Tiling and stone, then sanitaryware, glass, lighting and the vanity. We run everything, check the drainage under load, and walk the room with you before it goes back into use.

A bathroom we rebuilt in Dunbar

A cramped, dated bathroom in a Dunbar house, taken back to the structure and rebuilt around a new layout with a walk-in shower and heated floors.

Freestanding tub beside the glass shower and garden window
Dunbar bathroom renovation · tub and shower

In the owner’s words

“Steven and CAS helped us see what was actually possible. Upgrading the entire layout, expanding the shower, adding heated floors, everything was done right and the space finally feels modern and comfortable! The quality and communication were excellent from start to finish.”

Tracy & AlanVancouver, BCDunbar Bathroom Renovation

Where a bathroom budget actually goes

The fittings are the part you choose and the smaller part of the decision. These four move the number more.


Whether the layout moves
Leaving the toilet, bath and basin where they are is the cheapest version of this room. Moving them is the real decision, and it is made early.

What is behind the old tile
A soft substrate, a slow leak or a joist notched through for a pipe are normal findings in an older house. They are found by opening up, not by looking.

The specification
Tile format, stone, frameless glass and brassware can move the material line a long way without changing a single position on the plan.

Where the room is
An upstairs bathroom over a finished ceiling, or a condo over a concrete slab, changes how the waste can run and what has to come down to run it.

The proposal separates the hidden work from the visible work: services, substrate and waterproofing are priced apart from tile, stone and fittings. You can see which half a change is affecting.

Questions about bathroom renovations

  • It depends on whether the layout moves and on what the opened-up walls show. You get a dated schedule before the strip-out and an update each week while the work runs.

  • In most cases yes, though that bathroom is out of use for the whole of it. If it is the only bathroom in the house we plan the sequence around that and tell you what to expect before anything starts.

  • Yes. We take you through layout, tile, stone, glass and fittings. The tiling is set out on a drawing, so the joints and the niches land where they should.

  • There can be. If your renovation includes energy-efficient upgrades such as low-flow fixtures, improved insulation or efficient lighting, you may be eligible through BC Hydro’s Home Renovation Rebate Program. The programme sets the criteria, so we check your scope against them.

  • It depends on the size, the specification and whether the fixtures move. You get a detailed proposal before work begins, and anything found once the walls are open is priced and agreed with you before it is done.

Something not answered here?

Vancouver office, by appointment only.

Start with the room you have

Send us the bathroom as it is now and what is wrong with it. We will tell you what can move, what cannot, and what that means.

Steven Kwok, CAS Developments(778) 909-8321

Step 1 of 4 · Project

Every field is required unless its label says optional.

What are you planning?
We only use your details to reply about your project.

Prefer to send a note? Contact page

CallBook consultation