Three questions decide a bathroom before any product does. Whether you are rebuilding it for yourself or for a sale, whether the layout is the problem or only the surfaces, and what the room is actually short of.
Start with what the room has to do
It is easy to start a bathroom with a tile sample and work backwards from there. The useful order runs the other way. What the room has to do decides where things go, and where things go decides nearly everything after that.
Three questions do most of that work. None of them is about a product, and the answers change what a sensible scope looks like before anyone prices it.
- Are you rebuilding the room for yourself, or getting the house ready to sell? One answer puts the money into what you feel every morning. The other puts it into what a buyer registers on a first walkthrough.
- Is the layout the problem, or only the surfaces? Moving the toilet, the basin or the shower means opening the floor and the waste run. That is a different project from retiling the room you already have.
- What is the room actually short of? Storage, daylight, light at the mirror, somewhere to stand and dry off, or the clearances someone in the house will need later. Naming the shortage stops a renovation from fixing the wrong thing.
A character home and a condo are different projects
Most Vancouver bathrooms sit in one of two kinds of building, and the constraints barely overlap. Two rooms can be identical on paper. What you are allowed to move, and what it costs to move it, will not be.
Two starting points, two sets of limits
Nearly all of the difference is in what can move, and in who has to agree before it does.
An older house
- Small, dim rooms that often gain more from borrowing a strip of a hallway or a closet than from any new fixture
- Wiring and pipework near the end of its life, which is only properly visible once the walls are open
- A floor that has moved over the decades, which matters because tile and stone want a flat, sound substrate
- Character worth keeping, which usually means choosing tile and brassware that sit beside the house rather than argue with it
A condo
- Strata approval, which decides what is allowed to change before the design decides anything
- A concrete slab, so a new waste run rarely drops into the floor and has to be solved above it
- Noise and access rules that set the working hours and route every delivery through a shared lift
- A stack that serves other homes, which cannot be shut off whenever the work would like it to be
Neither column is a reason to do less. They are the reason the same bathroom is two different jobs in two different buildings, and why a number offered before either is understood is not worth much.
A small room, more paperwork than expected
Bathrooms pull more permits than most owners expect. In Vancouver, work on plumbing or electrical is permitted work, and moving a wall or touching anything structural can bring a building permit with it.
The BC Building Code sets what the finished room has to meet, with the Energy Step Code in play on wider projects. CAS prepares and submits the applications and books the inspections, as part of the work rather than as something handed back to the owner.
What delays a bathroom is rarely the paperwork itself. It is an inspection booked late, or a stage closed up before anybody signed it off, which means opening it again to show the inspector what is behind it.
Where the rules actually live
- City of Vancouver: building and renovatingWhich permits apply to a renovation, and how the City handles them. (opens in a new tab)
- BC Building CodeThe code the finished room is measured against, Energy Step Code included. (opens in a new tab)
- BC Hydro rebates and programmesWhat is on offer right now for efficient fixtures, lighting and insulation. (opens in a new tab)

The decisions you live with every day
Tile is the part of a bathroom everyone looks forward to choosing and close to the least important part of how the room works. These are the choices you notice every morning, and all of them are settled on a drawing long before anything is ordered.
- Light at the mirror. A single ceiling fixture puts your own shadow on your face. Light beside the mirror or around it is the fix, with a quieter layer for the rest of the room.
- Storage, planned before the vanity is picked. Drawers that clear the trap, a recess in the shower wall for bottles, and somewhere for towels within reach of the person using them.
- Materials that expect water. Porcelain and ceramic stay the usual answer on floors and wet walls because they are hard, stable and simple to clean. Anything porous is a maintenance decision, taken knowingly.
- Ventilation, sized for the room and ducted outside rather than into a roof space. A fan on a humidity sensor takes the judgement out of it, and humidity is what damages paint, grout and ceilings.
- Warmth underfoot. A heated floor and a heated rail both sit under or behind the finishes, so they are decided before the floor goes down and not after it.

What fails, and when you find out
The parts of a bathroom that fail are nearly all hidden. A membrane applied in a hurry. A floor that does not quite fall to the drain. A fixing driven into a substrate that was already soft. A fan vented into the roof.
None of that announces itself at handover. It arrives later as a stain on the ceiling below, grout that keeps darkening, or a patch of floor that feels different underfoot. By then the only route to the fault runs back through the finished surface.
The expensive mistake in a bathroom is not a tile you tire of. It is the layer underneath, which you can only reach by taking the tile off.
The four that move it
Cost is the first question and the hardest one to answer honestly in advance. The size of the room predicts less than people assume. Four other things do most of the work, and only one of them is a matter of taste.
The four that move the number
- Whether the fixtures move
- Leaving the toilet, bath and basin where they stand is the cheapest version of this room. Moving them changes the floor, the supply and the waste at once.
- What the old tile was hiding
- Soft substrate, a slow leak behind the shower, a joist cut through for a pipe. An older house usually has one of them, and none is visible until the room is stripped.
- The level the finishes are set at
- Format, stone, glass and brassware can carry the material cost a long way up without one position changing on the plan. It is the line you control from the first day.
- Where the room sits
- A bathroom above a finished ceiling, or one on a slab, limits where the waste can run. Reaching it often means taking something else apart first.
CAS does not publish a bathroom price, and the reason is not coyness. Two rooms of the same size can be different jobs. A figure given before anyone has seen the waste run or the substrate is a guess with a dollar sign on it.
Better to have a scope and a set of allowances written against your room. Set the contingency before the strip out, and set a rule for what it may pay for. A buffer with no rule attached gets spent on a better tap, and the repair found on day two has nothing behind it.
One place not to look for a saving is the hidden half. Waterproofing, tiling and plumbing are specialised trades, and the work they do is the work you cannot inspect later without undoing the room.
How long it takes
Two clocks run on a bathroom, and only one of them involves tools. Design, selections and permits take the first stretch. Anything that has to be ordered then sets its own pace, however fast the site is working.
CAS publishes two durations, and both describe whole houses rather than one room. That is the caveat on reading them here. The first of the two is still the stage a single bathroom shares with every other project.
The two durations CAS publishes
- 2 to 4 months
- Design, planning and permits
- 4 to 8 months
- Construction, full home
One room runs shorter than either figure. What it is not is quick, and the stage people squeeze is the first one, which is the only part of a renovation where changing your mind is still free.
Ordering early is what protects the rest. A vanity on back order holds up a room that is otherwise finished, and nobody can tile around a decision that has not been made.

Worth settling before anything is ordered
Settle the layout first. Where the toilet, the basin and the shower sit decides the services, the storage and most of the cost, and every later choice is specified against it.
Buy the lasting version of anything you touch daily. A tap, a hinge or a shower valve replaced early is paid for twice, and the second time the price includes taking tile off a wall.
Order against the slowest item, not the fastest. Tile, stone, glass and brassware each have their own lead time, and the room waits on whichever one arrives last.
Ask for the hidden work and the visible work to be priced apart. It is the only way to see which half a change is really affecting when you ask what it costs.
What to put to whoever is quoting
These are the questions that separate a quote somebody has thought about from a number somebody has produced. Worth asking of anyone pricing your bathroom, CAS included.
- Is the waterproofing named as a product and a system, or only described as waterproofing?
- Where does the extract duct terminate? Outside, through a wall, rather than into a roof space.
- What has been assumed about the substrate and the waste run, and what happens to the number if the assumption turns out to be wrong?
- Which lines are allowances, and what real product was each one set against?
- What is the contingency allowed to pay for, and is a better tap on that list?
- Who books the inspections, and at which stages does work stop until one has happened?
A room priced by somebody who has answered those is a room priced against your house. One priced without them is priced against the bathroom they are hoping is behind your tile.