Accessibility
Accessibility statement
Last reviewed: November 2026
CAS Developments wants everyone to be able to use this website, including people who use screen readers, keyboards, magnification or voice control.
Our standard
This site is built towards the Web Content Accessibility Guidelines (WCAG) 2.2 at level AA. Most of it meets that standard today, and we are not claiming the whole of it yet: the gaps we know about are listed further down this page, with what causes them.
We would rather tell you what is still wrong than publish a claim the site does not carry.
What we have checked
Each of these was measured on the main page types, at desktop and phone widths, rather than assumed.
- Keyboard
- Every control can be reached and operated from the keyboard. A skip link jumps past the header to the main content, and the focus outline is always visible, switching from dark to light so it stays legible on the dark sections.
- Contrast
- An automated contrast check across the main page types at two widths found no text below the required ratio. The footer, which carries the smallest text on the site, measures between 6.4 and 11.3 to 1 against a requirement of 4.5.
- Zoom and reflow
- The site reflows to a single column and never scrolls sideways down to 320 pixels wide, which is what a 400 per cent zoom produces on a laptop screen.
- Text alternatives and forms
- Photographs carry alternative text describing what is actually in the frame. Every one of the 29 controls on the enquiry form has a label a screen reader can read, and when the form rejects an entry the message is announced and tied to the field it belongs to.
- Reduced motion
- If your device asks for reduced motion, the site does not animate. Every section renders in its finished state, with nothing pinned, scrubbed or part way through a transition.
Known limitations
These came out of the last automated audit and have not been fixed yet.
- Specification lists are not announced as lists
- On the service pages and a few others, the paired labels and values that describe a project use description markup without the container that groups it. A screen reader may read the pairs without saying that they form a list, so the relationship between a label and its value can be lost. It affects 146 places across twelve pages.
- Dividers inside lists
- Some lists place a horizontal divider directly inside the list rather than around it, which is not valid list structure and can make a screen reader miscount the items. It affects 28 places across sixteen pages.
Feedback
If something on this site does not work for you, please contact us and we will help, and we will take your enquiry over the phone if the form is in your way.
About this site
This website was designed, built and tested for accessibility by Phoenix, a strategy and design studio in Vancouver.

