Full home renovations
Home Renovationsin Vancouver
Rooms that no longer fit how you live, in a house worth keeping. The work starts on paper: layout, structure and permits settled before anything is demolished.
- Over 20 years
- Working in Vancouver and the Lower Mainland
- Licensed and insured
- British Columbia
- Design, permits, build
- One company from the drawings to handover
A layout question first
A whole-house renovation is a layout decision before it is a finishes decision. Where the kitchen sits, which walls carry load, how daylight reaches the middle of the floor: those choices set everything that follows, and they are cheapest to change on paper.
Design, engineering and permitting are handled in-house, so the plan is tested against your budget and the city’s requirements before materials are ordered. You see floorplans, elevations and real samples, and nothing gets built from a drawing you have not approved.
Which one is your project?
- One room at a timeA kitchen or a bathroom on its own, with the rest of the house left alone. Shorter, cheaper, and you can usually stay living there.
- The whole house at onceLayout, services and finishes resolved together, so the rooms match and the house is opened up once rather than three times.

What the work covers
The things a whole-house renovation touches. Most projects take on several of them at once, which is why they are planned as one sequence and not as a list of jobs.
- Layout and flowWalls moved or taken out so the rooms you use most get the space and the light.
- Kitchens and bathroomsThe rooms with the most plumbing and the hardest wear, rebuilt together rather than one at a time.
- DaylightWindows, openings and sightlines reworked so light reaches the centre of the house.
- Services behind the wallsPlumbing, electrical, heating and insulation brought to current code while the walls are open.
- Indoor to outdoorDoors, levels and thresholds reworked so the garden reads as part of the main floor.
- Millwork and storageCabinetry, built-ins and closets drawn for your rooms instead of ordered to fit them.
- Comfort and efficiencyInsulation, glazing and mechanicals, for a quieter and cheaper house to run.
- Room to changeA plan that still works when a family grows, or when someone moves back in.

How the work is sequenced

- Design, planning and permits
- 2 to 4 months
- Construction, full home
- 4 to 8 months
The first two stages decide the project and the last two deliver it. You approve the drawings in between, and that approval is what the schedule is built from.
Stage 01
Discover and plan
The house is measured and assessed before anything is drawn.
We walk the house with you, take measurements, and check the structure, drainage and electrical. You come out of it with a defined scope and a budget you can make a decision on.
Stage 02
Design and drawings
Concepts, then one resolved plan with the materials specified.
You see concepts first, then one resolved set: floorplans, elevations, 3D views and real samples to handle. Engineering and the permit application are drawn from the same set.
Stage 03
The build
Demolition through finishing, run as one schedule.
Demolition, framing, services and finishing run in one sequence under one project manager, with a weekly update and a single point of contact. City inspections are booked and attended for you.
Stage 04
Finishes and handover
Every finish checked, corrected, then walked with you.
Finishes are checked and put right, the house is cleaned, and appliances and services are tested. We walk the whole house with you before you move back in, and the list from that walk gets closed out.
Whole-house work, after handover
CAS projects where the whole home changed, photographed once the owners had moved back in.

In the owner’s words
“We wanted a home that felt peaceful and luxurious for our father. Steven understood exactly what we were trying to create. The custom furniture, the warm lighting, the wood features. Everything feels thoughtful and beautifully done.”
What changes the shape of a renovation
Two houses the same size rarely run the same way. These are what move the drawings, the schedule and the budget.
- Finish level
- One layout can be specified three different ways. The specification is where most of the range sits.
- Structural work
- A load-bearing wall or a new roofline brings an engineer into the drawings and a longer review into the permit.
- Age and condition
- Older houses hide knob-and-tube wiring, failing drains and foundation movement. We open up and check before the budget is fixed.
- Permits and zoning
- Character areas carry longer review times at the city, so permitting starts while the design is still being resolved.
- Size of the house
- Flooring, windows, heating runs and plumbing stacks all scale with the floor area.
- Changes made mid-build
- A decision changed after framing costs more than the same decision changed on the drawings.
Before construction starts you get a line-itemed budget: structure, services, finishes, labour and permits, each priced separately. A contingency line is planned in from the start rather than added later.
Questions about full home renovations
Construction on a full home usually runs 4 to 8 months, depending on size and complexity. Design, planning and permits usually take 2 to 4 months before that. You get a dated schedule during planning, and it is updated weekly once the build starts.
For a whole-house renovation, usually not. Water and power are off for long stretches and the work moves floor to floor. For a single-room project you often can. We tell you which situation you are in during planning, not after demolition.
Yes. The drawings, the engineering and the permit application are ours, including the city’s requests for more information. The same team carries the project through construction, so nothing is lost in a handover.
It depends on finish level, structural work and the age of the house. You get a line-itemed proposal before construction begins, and any change to scope or cost is priced and agreed with you before that work happens.
No. Our own design team produces the drawings, and we bring in a structural engineer or a specialist consultant where the project needs one. If you already have an architect, we are happy to build from their drawings.
Payments are staged: a deposit, progress draws tied to work actually completed, and a final payment at handover. If you are financing the renovation, we can introduce you to lenders who work on projects like yours.
Something not answered here?
Vancouver office, by appointment only.
Before you commit to anything
What the work involves, what sets the number, and what the city asks for, written out in full rather than summarised.
All guides
Renovations That Add the Most Resale Value in Vancouver’s MarketA buyer makes up their mind about your kitchen in roughly the first minute of standing in it. An appraiser works from documents and from what sold nearby. Those two readers, and what each of them can actually see, are what this is about.
Renovating Heritage Homes in Vancouver: Rules, Costs and ChallengesA pre-war Vancouver house is largely old-growth fir: tight-grained, dimensionally stable, and not available new at any price. What decides how you are allowed to treat it is something else entirely — what the property is, legally, and four different answers are possible.
How to Choose the Right Home Renovation Contractor in VancouverYou cannot assess anyone's carpentry from a conversation at your kitchen table. What a conversation does show is whether they have looked at your house, and what their paperwork is like when you ask to see it.
Start with a conversation about your house
Tell us what is not working and what you want instead. We will come back with what is possible on your lot and what it takes to get there.