Rooms that no longer fit how you live, in a house worth keeping. The work starts on paper: layout, structure and permits settled before anything is demolished.

Over 20 years
Working in Vancouver and the Lower Mainland
Licensed and insured
British Columbia
Design, permits, build
One company from the drawings to handover

A layout question first

A whole-house renovation is a layout decision before it is a finishes decision. Where the kitchen sits, which walls carry load, how daylight reaches the middle of the floor: those choices set everything that follows, and they are cheapest to change on paper.

Design, engineering and permitting are handled in-house, so the plan is tested against your budget and the city’s requirements before materials are ordered. You see floorplans, elevations and real samples, and nothing gets built from a drawing you have not approved.

Which one is your project?

Bathroom with a floating stone vanity and a full-height window beside the bath

What the work covers

The things a whole-house renovation touches. Most projects take on several of them at once, which is why they are planned as one sequence and not as a list of jobs.

  • Layout and flowWalls moved or taken out so the rooms you use most get the space and the light.
  • Kitchens and bathroomsThe rooms with the most plumbing and the hardest wear, rebuilt together rather than one at a time.
  • DaylightWindows, openings and sightlines reworked so light reaches the centre of the house.
  • Services behind the wallsPlumbing, electrical, heating and insulation brought to current code while the walls are open.
  • Indoor to outdoorDoors, levels and thresholds reworked so the garden reads as part of the main floor.
  • Millwork and storageCabinetry, built-ins and closets drawn for your rooms instead of ordered to fit them.
  • Comfort and efficiencyInsulation, glazing and mechanicals, for a quieter and cheaper house to run.
  • Room to changeA plan that still works when a family grows, or when someone moves back in.
Timber panelling meeting a dark wall at a corner, lit from above

How the work is sequenced

Kitchen and dining area with pendant lights over a long table and a staircase behind
Design, planning and permits
2 to 4 months
Construction, full home
4 to 8 months

The first two stages decide the project and the last two deliver it. You approve the drawings in between, and that approval is what the schedule is built from.

  1. Stage 01

    Discover and plan

    The house is measured and assessed before anything is drawn.

    We walk the house with you, take measurements, and check the structure, drainage and electrical. You come out of it with a defined scope and a budget you can make a decision on.

  2. Stage 02

    Design and drawings

    Concepts, then one resolved plan with the materials specified.

    You see concepts first, then one resolved set: floorplans, elevations, 3D views and real samples to handle. Engineering and the permit application are drawn from the same set.

  3. Stage 03

    The build

    Demolition through finishing, run as one schedule.

    Demolition, framing, services and finishing run in one sequence under one project manager, with a weekly update and a single point of contact. City inspections are booked and attended for you.

  4. Stage 04

    Finishes and handover

    Every finish checked, corrected, then walked with you.

    Finishes are checked and put right, the house is cleaned, and appliances and services are tested. We walk the whole house with you before you move back in, and the list from that walk gets closed out.

Whole-house work, after handover

CAS projects where the whole home changed, photographed once the owners had moved back in.

In the owner’s words

“We wanted a home that felt peaceful and luxurious for our father. Steven understood exactly what we were trying to create. The custom furniture, the warm lighting, the wood features. Everything feels thoughtful and beautifully done.”

Fenny W.Downtown Vancouver, BCDowntown Vancouver Condo Renovation

What changes the shape of a renovation

Two houses the same size rarely run the same way. These are what move the drawings, the schedule and the budget.


Finish level
One layout can be specified three different ways. The specification is where most of the range sits.

Structural work
A load-bearing wall or a new roofline brings an engineer into the drawings and a longer review into the permit.

Age and condition
Older houses hide knob-and-tube wiring, failing drains and foundation movement. We open up and check before the budget is fixed.

Permits and zoning
Character areas carry longer review times at the city, so permitting starts while the design is still being resolved.

Size of the house
Flooring, windows, heating runs and plumbing stacks all scale with the floor area.

Changes made mid-build
A decision changed after framing costs more than the same decision changed on the drawings.

Before construction starts you get a line-itemed budget: structure, services, finishes, labour and permits, each priced separately. A contingency line is planned in from the start rather than added later.

Questions about full home renovations

  • Construction on a full home usually runs 4 to 8 months, depending on size and complexity. Design, planning and permits usually take 2 to 4 months before that. You get a dated schedule during planning, and it is updated weekly once the build starts.

  • For a whole-house renovation, usually not. Water and power are off for long stretches and the work moves floor to floor. For a single-room project you often can. We tell you which situation you are in during planning, not after demolition.

  • Yes. The drawings, the engineering and the permit application are ours, including the city’s requests for more information. The same team carries the project through construction, so nothing is lost in a handover.

  • It depends on finish level, structural work and the age of the house. You get a line-itemed proposal before construction begins, and any change to scope or cost is priced and agreed with you before that work happens.

  • No. Our own design team produces the drawings, and we bring in a structural engineer or a specialist consultant where the project needs one. If you already have an architect, we are happy to build from their drawings.

  • Payments are staged: a deposit, progress draws tied to work actually completed, and a final payment at handover. If you are financing the renovation, we can introduce you to lenders who work on projects like yours.

Something not answered here?

Vancouver office, by appointment only.

Start with a conversation about your house

Tell us what is not working and what you want instead. We will come back with what is possible on your lot and what it takes to get there.

Steven Kwok, CAS Developments(778) 909-8321

Step 1 of 4 · Project

Every field is required unless its label says optional.

What are you planning?
We only use your details to reply about your project.

Prefer to send a note? Contact page

CallBook consultation