You cannot assess anyone's carpentry from a conversation at your kitchen table. What a conversation does show is whether they have looked at your house, and what their paperwork is like when you ask to see it.
What a meeting can and cannot tell you
Choosing a builder feels like judging competence, and competence at building is the one thing a meeting cannot show you. Nobody can see a mitre joint in a conversation.
What a meeting shows is thinking. Whether they have looked at your particular house. Whether they can describe the path through the City for your scope. And what they do on reaching a question they cannot answer.
So the whole exercise is reading two things: the quality of the answers you get, and the state of the documents behind them. Both are available to you before you sign anything.
You are not judging craft at the kitchen table. You are judging whether someone has thought about your house, and whether their paperwork says what they said.
Write the brief before you call anyone
A page of your own writing is what makes two quotes comparable. Without it each firm scopes a slightly different project, and the cheapest number then belongs to the smallest project.
Write down what is being renovated, room by room, and what is deliberately being left alone.
Say what level the finishes are at, in products where you can. A named tap is clearer than a word like mid-range.
Split the list into what has to happen and what would be good. Then say which of the second group you would drop first.
Put down the date you need to be living in it, and say whether that date can move.
Build the shortlist from people who have stood in finished work rather than scrolled past it: neighbours, a designer, local trades.

Five questions, and what a good answer sounds like
Any of these can be answered well or badly, and the difference is specific rather than tonal. A good answer has your house in it. A weak one describes a company.
The question, and the answer worth hearing
- Who is here on an average day?
- A useful answer names a role and a person, and says what happens on the days that person is somewhere else. A vague one describes the firm.
- What does the City's process look like for this scope?
- A useful answer walks through the order of submissions and inspections, and says where it usually waits. “Permits are handled” is not an answer.
- What have you assumed about what is behind my walls?
- A useful answer names its assumptions and says which of them carry an allowance. A fixed price offered without a site visit is the opposite of that.
- How will a change be priced, and who signs it?
- A useful answer is a sequence: a written request, a price before the work starts, and one named person who can approve it.
- Tell me about a job that went wrong.
- A useful answer is specific, and unflattering in places. An account with no bad days in it is a sales answer rather than a record.
The last one is the most informative and the least often asked. Any firm that has built anything has a job it would describe differently now.
The documents, and their dates
Credentials are easier to check than to discuss, because each one is a document with a date on it. Ask to see them rather than asking whether they exist.
- A business licence for the municipality the work is actually in
- A WorkSafeBC clearance letter dated close to your start date, not to last year
- A liability insurance certificate showing a current period, with the insurer named
- The firm's own standard contract, read while you are still only reading it
- References from recent work near enough that you could go and look at it
All of that applies to anyone quoting on your house, CAS included. It is a routine request, and a company carrying current cover produces the documents without being asked twice.

Reading two quotes side by side
Quotes get compared on the total, because the total is the only line that appears in both. The more useful comparison is which rows appear in one and not in the other.
So read them as two documents rather than as two prices, and look for these rows in each.
- Pre-construction: design, selections and the permit-ready drawing set
- Permits: who applies, who pays, and who carries a revision if one is asked for
- Engineering, structural and energy details, named
- Rough-ins as their own line, separate from installing the fixtures
- Allowances by category, each with a figure and a note on what the figure assumes
- Labour and trades, broken out far enough to see what is being bought
- Site protection, dust control and the final clean
- Waste removal and recycling
- A schedule with milestones, and the inspection windows marked on it
- The change process: how a request is made, priced and approved
- A payment schedule tied to completed work
Then score them yourself, row by row, and keep the scores. The exercise is less about arithmetic than about noticing which questions each firm had already thought about.
Strata and character houses change the brief
Two kinds of house need a different set of questions, and in both cases the thing to ask for is the specific experience rather than the general claim.
What to ask, by the kind of house you have
In both cases ask about a job, a building or a street, not for a sentence about being comfortable with this kind of work.
In a strata building
- How materials get staged when there is no room on the floor to stage them
- Who books the elevator, and what happens when the window gets missed
- How the permitted hours are worked within, and what that does to the schedule
- Who speaks to the property manager, and how often
- How common areas are protected, and who pays if something gets marked
In a character house
- How they approach selective demolition rather than stripping a room out
- What they expect to find in the wiring and the plumbing, and why
- How they handle the envelope on a house that has been altered twice already
- What the heritage expectations are on your street, in their own words
- How a contingency gets set when much of the scope is still unknown

Go and stand on one of their sites
One piece of evidence is neither an answer nor a document, and it is the most informative of the three. Ask to visit a job that is running now.
Look at whether floors and occupied rooms are protected, not at whether the site is tidy on a Friday afternoon.
Find the staging area. A crew with nowhere to put things puts them where you will be living.
Work out who is running the day. If it takes a while to tell, that is the answer.
Check that the permit is posted and the inspections are logged where anyone can read them.
Then ask yourself the honest question: would you want this crew in your house for months.
None of this is about catching anyone out. It is about having the same information in front of you that you would want on the day a decision has to be made quickly.