Home Renovation in Dunbar
Dunbar is the one area on this site where we can show you a finished CAS project. It is also Vancouver Special country, and that changes the work.
In this neighbourhood
- Housing stock
- Vancouver Specials from the 1960s and 1970s, character houses from the 1920s to the 1950s
- Lots
- Generous by Vancouver standards, nearly all with a lane behind them
- The usual first question
- Whether the split-level wall you want gone is carrying the floor above
- Over 20 years
- Across Vancouver and the Lower Mainland
- Licensed and insured
- British Columbia
- Drawings and permits
- Prepared, filed and followed through by CAS
One house type runs this neighbourhood
Dunbar has character houses and mid-century bungalows like the rest of the west side. What it has more of is the Vancouver Special, and that one is a different brief.

1960s to 1970s
The Vancouver Special
A boxy two-level house with the living space up and a low, wide floor below it. The layout logic is sound and the lot is usually generous, so these are worth reworking rather than replacing.
The lower floor is the prize: already close to suite proportions, so the stair, the fire separation and the metering are the work, not a dig. Upstairs, the walls between the kitchen and the living room are carrying the roof, which is why a Special needs an engineer before it needs a cabinet supplier.
1920s to 1950s
Character houses
Fir floors, wood trim and built-in cabinetry worth keeping, behind rooms that no longer match how anyone cooks or eats. Systems are the hidden half: the wiring, the supply pipe and the insulation all date from the build.
1950s to 1960s
Mid-century bungalows
Low, long and simple to open up, with a basement that is usually dry and usually tall enough to finish. The roof structure is the limit on how far the ceiling can go.
Any era
The lot behind the house
Dunbar lots and lanes are often wide enough that a rear extension or a laneway house is physically possible under R1-1. Whether yours is gets checked against the survey, not the street.

The project we built in Dunbar
One bathroom, rebuilt on a new layout, with the plumbing upgraded and a heated floor. Both photographs are of that job, and the full set is on its own page.


“Steven and CAS helped us see what was actually possible. Upgrading the entire layout, expanding the shower, adding heated floors, everything was done right and the space finally feels modern and comfortable! The quality and communication were excellent from start to finish.”
The permit path in Dunbar
Everything structural, electrical, plumbing or mechanical is a City of Vancouver filing. On a Special, one more thing usually joins the pile.
- Engineering review
- Modifying a bearing wall or reconfiguring a split level normally needs a structural engineer's drawings before the City will look at it.
- Suite requirements
- Ceiling height, egress, fire separation and separate metering are set by bylaw, and a Special's lower floor usually clears them.
- The queue
- Review times on a City of Vancouver filing run longer than the suburbs. A complete first submission is the only lever anyone has.
- Design, planning and permits
- 2 to 4 months
- Construction, full home
- 4 to 8 months
Where Dunbar projects usually start
The service list, ordered the way a Dunbar house tends to need it. Each one opens the full page.
Bathroom RenovationsThe one we have finished and photographed in this neighbourhood.
Full Home RenovationsReworking a Special across both levels, with the structure sorted before the finishes.
Basement RenovationsTurning a Special's lower floor into a suite that passes inspection.
Home AdditionsGoing back or up, where the lot and the roof structure allow it.
Laneway HousesA second small house on the lane, if the survey supports it.
Questions about renovating in Dunbar
Vancouver office, by appointment only
(778) 909-8321Ask about your addressYes. The split-level layout, the bearing walls between the kitchen and living room, and the lower floor's suite potential are the three things we look at first. What is structurally possible comes before what it costs.
Yes, on one project we can show you: a full bathroom rebuild with a new layout, upgraded plumbing and a heated floor. The photographs and the owners' own words are on its page.
Usually. A Special's lower level tends to have the ceiling height already, so the work is the stair, the egress window, the fire separation and a separate electrical meter. We measure before committing to any of it.
Design and permits usually take 2 to 4 months. Construction on a full home usually takes 4 to 8 months. A Special that needs engineering drawings adds time at the front of that, not at the end.
What moves the number on a Dunbar house
The figure is written against your drawings, not a price list. On a Special these four decide most of it.
- How much of the structure moves
- One wall with a beam over it is a line item. Reworking the split level is a different project.
- Whether the lower floor becomes a suite
- A second kitchen, a separate entry, fire separation and its own meter, all at once.
- The exterior
- Stucco, aluminium windows and the front balcony are what date a Special from the street.
- Mechanical
- Heating a two-level house off one ageing system usually ends in new ducting or a heat pump.

Walk the house with us
Send the address and tell us which level is not working. We will tell you what the structure allows before anyone talks about finishes.
Book free consultationWho you would be talking to
Steven Kwok, CAS Developments(778) 909-8321