Here’s how we guide you from that first conversation to move-in day (and beyond), with clarity, care, and zero stress.
Typical timings
- Design, planning and permits
- 2 to 4 months
- Construction, full home
- 4 to 8 months
Both figures are typical rather than quoted. Scope and complexity move them, and your own timeline is set at the consultation.
The five stages, in full
The homepage names the stages. This is the detail under each one, in CAS’s own words, with what you do and what you are holding at the end of it.
Step 1
Discover & Plan

It Starts With Listening.
Before we talk floorplans or finishes, we get to know you and your home.
We begin every project with a conversation. You walk us through your space, tell us what’s working and what’s frustrating, and share how you want to live differently.
We ask about routines, pain points, and priorities: How do you use the kitchen? Are the kids growing and needing more space? Do you host often, or crave more privacy?
From there, we evaluate the structure, layout, and potential of the home. We’ll take measurements, assess key systems (like plumbing or electrical), and flag anything that could impact design or cost. You’ll leave this phase with a clear picture of what’s possible and what makes the most sense for you.
Whether we’re renovating a single room or rebuilding from the ground up, we always start by understanding what matters most to your family, and how your space can support that.
At this stage
- What you do
- Walk us through the house and say what is working and what is frustrating. Expect questions about routines, the kitchen, and whether you host.
- What we do
- Measure the house, evaluate the structure and the layout, and assess key systems like the plumbing and the electrical.
- What you leave with
- A clear picture of what is possible in this house, and anything that could affect the design or the cost.
Step 2
Design & Visualize
We Co-Design With You.
We walk you through layouts, finishes, and fixtures, helping you see the design before a hammer ever hits a nail.
Once we’ve mapped out your goals, we start designing layouts that enhance flow, maximize light, and bring out the character of your home. Our in-house design team and trusted architectural partners present multiple concepts, always explaining why certain choices are being made.
We don’t overwhelm you with hundreds of options. Instead, we guide you toward curated, high-quality materials and finishes that suit your style, budget, and lifestyle needs.
Throughout this phase, you’ll see floorplans, mood boards, 3D visuals, and real samples so you can fully imagine the end result before construction begins. Your input drives every decision. We guide, you decide.
At this stage
- What we do
- Lay the floor out against flow, daylight and the character of the house, then present more than one concept with the reasons behind each.
- What you see
- Floorplans, mood boards, 3D visuals and real samples, all before construction begins.
- What you decide
- Which concept, and which materials. The options are curated rather than endless, so the choices stay decidable.
Step 3
The Build
We Build With Precision.
Once plans are finalized, our team gets to work.
Because one team runs the whole job, from demolition and framing through trades and finishing, you get a smoother, more accountable experience. There’s no chasing down sub-contractors or coordinating ten different schedules.
You’ll have a dedicated project manager and one point of contact throughout. We’ll update you weekly, keep timelines transparent, and handle city inspections, permits, and code compliance along the way.
And because the same team has been on it from day one, nothing gets lost between design and build. No surprises, no delays. Just solid craftsmanship that speaks for itself.
At this stage
- Who runs it
- One project manager and one point of contact, from demolition and framing through the trades and the finishing.
- What we carry
- The trades and the schedule, plus the city inspections, the permits and the code compliance as the work moves.
- What you get each week
- An update on where the build is, so the timeline stays something you can see rather than ask about.
Step 4
Final Touches & Handover

We Obsess Over the Finish.
This is where we dial everything in.
We believe the last 10% of a project is what separates “good” from “great.” That’s why we slow down and zero in on the details: the grain of the millwork, the tone of the lighting, how a drawer opens and closes, or how the tile lines meet the corners.
You’ll walk through the space with us before handover, and we’ll fix anything that doesn’t feel 100% right.
Final cleanups, touch-ups, and functional testing (from plumbing to appliances) all happen before we say we’re done. This isn’t a rush to the finish. It’s a careful reveal of your new, fully personalized space.
At this stage
- What gets looked at
- The grain of the millwork, the tone of the lighting, how a drawer closes, how the tile lines meet in a corner.
- What you do
- Walk the finished space with us and name anything that is not right. It gets put right before handover.
- Before we call it done
- Final cleanups, touch-ups, and functional testing from the plumbing through to the appliances.
Step 5
Post Handover
We’re Still Here After Handover.
Moving in isn’t the end of our relationship, it’s the start of a new one.
We know real life begins once you start living in the space. That’s why we check in post-project to make sure everything is working as expected. If something needs adjusting, we’re here, fast. No dodging calls, no warranty runaround.
You’ve trusted us with your home, and we take that seriously long after the tools are packed up.
We’ve built homes for growing families, repeat clients, and referrals, because when you do it right the first time, people come back.
At this stage
- What happens next
- We check in once you are living in the space, to see that everything is working the way it was meant to.
- If something needs adjusting
- Tell us and we come back to adjust it. The same team that built it is the one you are calling.
What is the same on every project
The five stages change shape with the job. These four do not.
- One point of contact
- A dedicated project manager runs the job, so there is one person to ask and one schedule to follow.
- A weekly update
- You hear where the build is each week, with the timeline as it actually stands.
- Permits and inspections
- Design, engineering and permitting are handled in-house, and city inspections and code compliance are carried by us.
- A check-in after you move in
- We come back once you are living in the space, to see that everything is working as expected.

Questions about how it runs
Four of the questions people ask before the first stage, answered in CAS’s own words from the live site.
Every home is unique, so timelines vary depending on the scope and complexity of your project. On average, a custom home renovation in Vancouver can take anywhere from 4 to 8 months from the start of construction. Before that, the design, planning, and permitting phase usually takes about 2 to 4 months. During your consultation, we’ll give you a clear, realistic timeline so you always know what to expect.
Yes. Design, engineering and permitting are all handled in-house, so you don’t have to worry about coordinating with separate architects or city offices. We take care of all approvals and ensure your project meets local building codes and zoning requirements.
In some cases, yes. But it really depends on the scale of your renovation. For smaller projects (like single-room updates), you may be able to stay at home with some adjustments. For full home remodels or major structural work, we typically recommend arranging alternate accommodations to ensure your safety and to allow the team to work as efficiently as possible. We’ll help you understand what’s best for your situation during the planning phase.
Yes, we understand that ideas evolve as the project takes shape. Our design-build approach makes it easier to accommodate changes, but keep in mind that adjustments can impact timelines and costs. We’ll review any changes with you in detail so you can make informed decisions without any hidden surprises.
Start at stage one
The first stage is a conversation in the house. Tell us what is not working and we will tell you what is possible in it.
Steven Kwok, CAS Developments(778) 909-8321
- Design, planning and permits
- 2 to 4 months
- Construction, full home
- 4 to 8 months