A focal point for the living room
The old setup came out and a built wall went in. The television sits on a floating cabinet with shelves beside it, and the cabling runs inside the wall rather than down it.
Black and grey against the new neutral finishes, so the room has something to sit around without competing with the rest of the floor.












